The Middlesex Road Committee formed in April of 2024 in response to a major flood in 2023 and the exceptionally warm winter of 2024 which created extremely muddy roads. Three months later, serious floods again washed out roads throughout Middlesex.
The Road Committee looks into planning, funding, maintenance and improvements needed to sustain more than forty miles of roads. It supports the work of the Town’s road crew warriors who battle rain, wind, snow and toppled trees to make sure this vital network remains open.
About Members
Meetings
Committee meetings are the third Thursday of each month from 5 to 6:30 pm at Town Hall and By Zoom - See calendar for Zoom link to this meeting.More Information
Click sections to expand.
Chair
Zara Vincent
Paul Cerminara
Mike Kline
Hilton Dier III
Steve Martin
Richard Cowles
Sandy Levine
Marianne Mullin
John Rahill
Dexter Lefavour
Jessica Millard
Scott Gurley
Vic Dwyer
For more information on Middlesex roads and culverts visit:
After devastating floods and washouts in 2023 and 2024, Brook Road in Middlesex has been rebuilt with travel along the road, and access to homes again possible. However, if you drive or walk along the road with an eye toward the brook, it is easy to see the continued risks of more erosion and landslides.
Looking to the future, what can we as a community do to:- best provide access to properties
- maintain a route that is safe to travel,
- avoid expensive and time-consuming rebuilding after rain events
The Great Brook Futures Project
The Great Brook Futures Project is being led by Mike Kline, a river ecologist who lives in Middlesex and knows Great Brook well. The work is being sponsored by the Middlesex Road Committee, a local committee of volunteer neighbors.The Great Brook Futures Project works with University of Vermont and Norwich Engineering faculty and students, Vermont Agency of Natural Resources staff, local residents and volunteers to collect and analyze river, road and weather data and geology to help find long-term solutions to curb ongoing erosion. Middlesex is doing its homework to help show what is needed to keep people and property safe in the long run.
The Great Brook Futures Project will:
1) Collect data and evaluate alternative engineering or natural solutions that will stabilize the brook and its hillslopes to reduce future hazards and costs to the town and property owners2) Provide benefit-cost information to the town and property owners wanting to explore home buyouts or alternate road and drive alignments to protect against future flood or landslide damage.
Work has already begun at no cost to the town. This includes:
- Aerial drone imagery and fine scale topography maps to support stream and slope stability studies.
- Collecting data on road infrastructure, stream movement, and maintenance and stream stabilization costs to support possible restoration projects.
- Collecting geologic and river information needed to develop cost-effective solutions.
What’s Next?
The data collection listed above will put us in a good position to obtain the hazard mitigation funding that is typically available. Assuming that we are successful with getting grants, it may take another year or so to look at alternatives and complete restoration designs. If there are more cost-effective ways to stabilize the brook and avoid/minimize the type of post-flood maintenance we are caught up in now, then we will seek additional funding to do on-the-ground projects.